- FOC damages repair and/or rectification are under the second party responsibility without any extra charges (Except the span replace which is more than 700 Meter) and within agreed SLA. The contractor is responsible to provide sufficient teams along the cable path (24H/7days a week) securing no more than 30 minutes arrival time to any point within the allocated route.
- Doing Splicing according to technical specification. Max loss is 0.01dbm, according to calibrated OTDR test. And any high-power loss must be fix by 24 hours as a maximum
- We’ve provided coordinates and photo report for each FOC damage with OTDR test
- We’ve laying the cables and the joins according to the open case standards and for soil levelling.
- We’ve, in case of micro trench FOC cut the fixing by replacing the section between the nearest hand holes.